Rayburn Royal OF7 No.2 No.3 212s 212sfw 208K Boiler Replacement

£200.00

Boiler to fit: Rayburn Royal/OF7/208K (left and right-hand models available)
Material: 316L Stainless Steel or 4mm mild steel
Guaranteed: Yes
Availability: Normally in stock

Prices:

Mild Steel (Recommended for hard water, direct systems)        £160+ VAT + Delivery £12.50 + VAT

Stainless Steel £200 + VAT + Delivery £12.50 + VAT

Stage 1 upgrade (Stainless steel only ) £400 + VAT + pallet delivery (Please contact us for a delivery price)  *requires top of machine to be removed for fitting. Approx 30,000 BTU’s

Stage 2 upgrade  (Mild Steel only) £550 + VAT + pallet delivery (please contact us for a delivery price) *requires top of machine to be removed for fitting. Approx 45,000 BTU’s

Stainless Steel Tail Pipes £30 + VAT

Top Tapping Boilers

We also supply the tail pipes for the top tapping boilers, with one pipe having a copper extension dip tube for the cold water return- essential for the boiler to function correctly.

Cost: Please call for a price

Delivery Costs & Payment

Larger boilers such as Stage 2 Royals are delivered on a pallet and normally take 2-3 days and are delivered Monday to Friday. Please contact us first with your address details for a quote. Smaller standard boilers such as the Royal are send in a package and take 2 days. Collection is always welcome.

Payment- we accept card payments over the phone (card details are never stored or recorded), cash, cheques made out to Goddard Fabrication, and even BACS. All boilers require payment first before dispatch.

Description

Boiler to fit: Rayburn Royal/ / No.2/ OF7/ 208K Left & Right hand oven, Top Tapping Versions
Material: Stainless Steel (indirect water supply only) or mild steel
Guaranteed: Stainless Steel 5 years Mild Steel 2 Years

Prices:

Stainless Steel £200 + VAT + Delivery £12.50 + VAT

(Please contact us if you are using an direct system, it may be that a mild steel option is better suited to your needs)

Stage 1 upgrade (Stainless steel ) £400 + VAT + pallet delivery (Please contact us for a delivery price)  *requires top of machine to be removed for fitting. Approx 30,000 BTU’s

Stage 2 upgrade  (Mild Steel) £550 + VAT + pallet delivery (please contact us for a delivery price) *requires top of machine to be removed for fitting. Approx 45,000 BTU’s

Stainless Steel Tail Pipes £35 + VAT

Top Tapping Boilers

We also supply the tail pipes for the top tapping boilers, with one pipe having a copper extension dip tube for the cold water return- essential for the boiler to function correctly.

Cost: Please phone for a price

Delivery Costs & Payment

Larger boilers such as Stage 2 Royals are delivered on a pallet and normally take 2-3 days and are delivered Monday to Friday. Please contact us first with your address details for a quote. Smaller standard boilers such as the Royal are send in a package and take 2 days. Collection is always welcome.

Payment- we accept card payments over the phone (card details are never stored or recorded), cash, cheques made out to Goddard Fabrication, and even BACS. All boilers require payment first before dispatch.

Additional information

Type

Standard, Stage 1, Stage 2